INNOVARE KTI

Reference

Total 413 The thing is 6 Page
Reference List
KTI PROJECT LIST
CLIENT CONTRACTOR PLANT LOCATION APPLICATION DUTY / CAPACITY SCOPE YEAR OF
COMPLETION
Eastman Chemicals Mustang Kingsport, Tennessee Cracking Furnace 9.18 MMBtu/hr EP 2009
NCP DIC Jubail, Saudi Arabia Hot Oil Heater 17.06 MMBtu/hr EP 2009
Shintech Shin-etus Addis, LA Four EDC Crackers with SCR for 562,000 MTPY VCM Plant 4 @ 73.46 MMBtu/hr EPC 2009
Shintech Shin-etus Addis, LA One EDC Cracker with SCR for 562,000 MTPY VCM Plant 73.46 MMBtu/hr EPC 2009
ConocoPhillips Bechtel Woodriver, IL HDT Charge Heater 8.0 MMBtu/hr EP 2009
ConocoPhillips Bechtel Woodriver, IL Vacuum Heater with WHR 268.8 MMBtu/hr EP 2009
ConocoPhillips Bechtel Woodriver, IL Delayed Coker with Steam Generation (2 Nos.) 184.7 MMBtu/hr +
28.02 MMBtu/hr
EP 2009
Bechtel KTI USA Texas, USA Fractionator Feed Furnace 309.8 MMBtu/hr
(SSH) 8.72 MMBtu/hr
E 2008
GS Caltex Corp. GS Caltex Corp. Yeosu, Korea Crude Charge Heater 114.29 / 128.97 MMBtu/hr EPC 2008
Daesan MMA HEC Daesan, Korea New HTS Feed Heaters 27.15 MMBtu/hr EP 2008
Shell SKEC Thailand Residue Splitter Furnace 154 MMBtu/hr EP 2008
Petrobras Petrobras Brazil Steam Methane Reformer 50 MMSCR/day H2 EP 2008
BP Fluor Whiting, Indiana Vacuum Tower Heater 2 @ 95.64 MMBtu/hr EP 2008
BP Fluor Whiting, Indiana Crude Heater 2 @ 292.4 MMBtu/hr EP 2008
Motiva Jacobs Port Arthur Fractionator Feed Heater 318.52 MMBtu/hr EP 2008

Search