Reference

Total 413 The thing is 13 Page
Reference List
KTI PROJECT LIST
CLIENT CONTRACTOR PLANT LOCATION APPLICATION DUTY / CAPACITY SCOPE YEAR OF
COMPLETION
ExxonMobil Fluor Baytown, TX Reboiler for Clean Fuels Project 211 MMBtu/hr EP 2003
Flint Hills Resources KTI Corpua Christi, TX (2) Retrofit Paraxylene Heaters with Ultra Low NOx Burners 45 MMBtu/hr
33 MMBtu/hr
EPC 2003
Suncor Bantrel Ft. McMurray Two Vacuum furnaces, One Diluent Recovery furnace,
each with steam system
2 x 124 MMBtu/hr
110 MMBtu/hr
EP 2003
Syncrude UE-1 (Fluor/SNC) Ft. McMurray Fractionator Feed Heater w/APH 327 MMBtu/hr EP 2003
Syncrude UE-1 (Fluor/SNC) Ft. McMurray Revamp Hydrotreater Reactor Charge Heater 61 MMBtu/hr EP 2003
Conoco- Phillips/Tosco Jacobs Rodeo, California Revamp Hydrocracker for increased production,
and reduced emissions via new SCR
190 MMBtu/hr EP 2002
ExxonMobil Jacobs Baton Rouge, LA Revamp CO Boiler by installing new convection module 25 MMBtu/hr EP 2002
Flint Hills Resources KTI Pine Bend, MN Repair Transfer Line on H2 Reformer C 2002
Petrolera Ameriven Grupo Alvica/Fluor Daniel Jose, Venezuela 2- Vacuum furnaces 113.5 MMBtu/hr x 2 EP 2002
Petrolera Ameriven Grupo Alvica/Fluor Daniel Jose, Venezuela 2-Top fired Reformers & Auxiliaries 300 Tubes/Reformer x 2 EP 2002
ToscoConoco-Phillips Jacobs Rodeo, California Revamp of Cat Reformer for
Reduced Emissions via new SCR
230 MMBtu/hr EP 2002
Exxon Bechtel Baytown, Texas Two Delayed Cokers with APH 2 x 110 MMBtu/hr EPC 2001
Chevron Phillips Chemical KTI St. James, Louisiana Revamp styrene steam superheater 170 MMBtu/hr EPC 2001
ExxonMobil KTI Torrance, California Revamp terrace wall reformer 50 MM SCFD EPC 2001
Shell Canada Fluor Canada Scotford, Alb. Canada 8 Hydrocracker heaters 2 x 28, 2 x 31, 2 x 27, 2 x 40
MMBtu/hr
EP 2001