ExxonMobil |
Fluor |
Baytown, TX |
Reboiler for Clean Fuels Project |
211 MMBtu/hr |
EP |
2003 |
Flint Hills Resources |
KTI |
Corpua Christi, TX |
(2) Retrofit Paraxylene Heaters with Ultra Low NOx Burners |
45 MMBtu/hr
33 MMBtu/hr |
EPC |
2003 |
Suncor |
Bantrel |
Ft. McMurray |
Two Vacuum furnaces, One Diluent Recovery furnace,
each with steam system |
2 x 124 MMBtu/hr
110 MMBtu/hr |
EP |
2003 |
Syncrude |
UE-1 (Fluor/SNC) |
Ft. McMurray |
Fractionator Feed Heater w/APH |
327 MMBtu/hr |
EP |
2003 |
Syncrude |
UE-1 (Fluor/SNC) |
Ft. McMurray |
Revamp Hydrotreater Reactor Charge Heater |
61 MMBtu/hr |
EP |
2003 |
Conoco- Phillips/Tosco |
Jacobs |
Rodeo, California |
Revamp Hydrocracker for increased production,
and reduced emissions via new SCR |
190 MMBtu/hr |
EP |
2002 |
ExxonMobil |
Jacobs |
Baton Rouge, LA |
Revamp CO Boiler by installing new convection module |
25 MMBtu/hr |
EP |
2002 |
Flint Hills Resources |
KTI |
Pine Bend, MN |
Repair Transfer Line on H2 Reformer |
|
C |
2002 |
Petrolera Ameriven |
Grupo Alvica/Fluor Daniel |
Jose, Venezuela |
2- Vacuum furnaces |
113.5 MMBtu/hr x 2 |
EP |
2002 |
Petrolera Ameriven |
Grupo Alvica/Fluor Daniel |
Jose, Venezuela |
2-Top fired Reformers & Auxiliaries |
300 Tubes/Reformer x 2 |
EP |
2002 |
ToscoConoco-Phillips |
Jacobs |
Rodeo, California |
Revamp of Cat Reformer for
Reduced Emissions via new SCR |
230 MMBtu/hr |
EP |
2002 |
Exxon |
Bechtel |
Baytown, Texas |
Two Delayed Cokers with APH |
2 x 110 MMBtu/hr |
EPC |
2001 |
Chevron Phillips Chemical |
KTI |
St. James, Louisiana |
Revamp styrene steam superheater |
170 MMBtu/hr |
EPC |
2001 |
ExxonMobil |
KTI |
Torrance, California |
Revamp terrace wall reformer |
50 MM SCFD |
EPC |
2001 |
Shell Canada |
Fluor Canada |
Scotford, Alb. Canada |
8 Hydrocracker heaters |
2 x 28, 2 x 31, 2 x 27, 2 x 40
MMBtu/hr |
EP |
2001 |