Shell Rayong Badger Rayong, Thailand Crude Heater 231MM Btu/hr EPC 1995
Shell Rayong Badger Rayong, Thailand Visbreaker Charge Heater 51.54MM Btu/hr EPC 1995
Shell Rayong Badger Rayong, Thailand HDS Reactor Charge Htr 45.4MM Btyu/hr EPC 1995
Shell Rayong Badger Rayong, Thailand HDS Fractionator Reboiler 54.56 MM Btu/hr EPC 1995
Shell Rayong Badger Rayong, Thailand Hydrocracker Reactor Charge Htr 41.98 MM Btu/hr EPC 1995
Shell Rayong Badger Rayong, Thailand Hydrocracker Fractionator Htr 62.1 MM Btu/hr EPC 1995
Shell Rayong Badger Rayong, Thailand CCR Platformer 205MM Btu/hr EPC 1995
Shell Rayong Badger Rayong, Thailand Hydrocracker Recycle Gas Htr 59.72MM Btu/hr EPC 1995
Shell Rayong Badger Rayong, Thailand Vacuum Furnace 133.09MM Btu/hr EPC 1995
Amoco Oil KTI Whiting, IN Hydrogen Plant Reformer 35 MMSCFD S 1993
Amoco Oil KTI Whiting, IN Hydrogen Plant Reformer 35 MMSCFD EPT 1993
Chevron KTI Ewa Beach, HI Crude Unit Revamp Replacement
New Crude/Vacuum Heaters
125 MMBtu/hr
52 MMBtu/hr
EPC 1993
Conoco KTI Lake Charles, LA Revamp UOP Platformer 156 MMBtu/hr EPC 1993
Cosmar KTI Carville, LA Revamp 3 Heaters for Lower NOx EPS 1993
Dupont KTI Memphis, TN Retube H2 Reformer 6 MMSCFD EP 1993